BLUSH AND GLOW FACIAL PACKAGE

Pre bridal facial treatment for wedding glow
  • DAY 0 - OXYGENEO FACIAL

  • DAY 20 - ADVANCE HYDRA FACIAL

  • DAY 40 - BRIDAL GLOW FACIAL

  • DAY 60 - KOREAN GLASS GLOW FACIAL

  • DAY 80 - KOREAN GLASS GLOW FACIAL

@12,000 Rs

@16,000 Rs

20% off

THE ULTIMATE GLOW PACKAGE

Bridal glow facial treatment
  • DAY 0 - OXYGENEO FACIAL + IV GLUTATHIONE

  • DAY 20 - HYDRA FACIAL + IV GLUTATHIONE

  • DAY 40 - BRIDAL GLOW FACIAL + IV GLUTATHIONE

  • DAY 60 - KOREAN GLASS GLOW FACIAL + FULL BODY POLISHING

  • DAY 80 - KOREAN GLASS GLOW FACIAL + FULL BODY POLISHING

@20,000 Rs

@30,500 Rs

34% off

COMPLETE SKIN REFINEMENT PACKAGE

Luxury bridal facial for radiant skin
  • FULL BODY LHR + OXYGENEO FACIAL + IV GLUTATHIONE

  • FULL BODY LHR + HYDRA FACIAL + GLOW PEEL

  • FULL BODY LHR + BRIDAL GLOW FACIAL + GLOW PEEL

  • FULL BODY LHR + KOREAN GLASS GLOW FACIAL + IV GLUTATHIONE + FULL BODY POLISHING

@40,000 Rs

@83,300 Rs

51% off

Have Something Specific On your Mind ?

Your Bridal Glow Begins Here

Pre bridal facial package for glowing skin before wedding

Customized skincare journeys designed to give you luminous,
camera-ready skin on your wedding day and beyond.

Every bride deserves to look and feel her absolute best. Our bridal packages combine advanced facial technologies, systemic skin brightening, and body treatments—strategically spaced to work with your skin's natural renewal cycle. The result? Genuine, lasting radiance that photographs beautifully and feels incredible.

facials for brides, IV, Body  Polishing

The Power of Strategic Combination

Individual treatments work. Combined treatments transform.

When IV Glutathione brightens from inside while facials perfect the surface, results multiply. When laser smoothness meets polished radiance, confidence soars. Our packages aren't random bundles—they're orchestrated protocols where each treatment amplifies the others.

Plus, the 52% savings on our Complete package means premium results at practically half the investment.

facial for wedding glow
A infographic explaining the concept of treatment synergy for better skincare results. It shows the combination of facial, IV therapy, and polish treatments, illustrating that adding them together can result in enhanced effects. The image includes icons of a face, IV bag, and a polishing tool, along with a puzzle piece connecting the treatments to a glowing, transformed woman at the bottom.

Know What You Are Getting

Diagram of full body polishing treatment process with three stages: exfoliate and buff, nourishing polish application, and radiant, even-toned result, featuring a woman’s silhouette with glowing skin.

Full Body Polishing: Exfoliation and nourishment for your entire body. Even skin tone from shoulders to toes.

Diagram of a HydraFacial treatment showing device cleaning pores, hydrating skin, and protecting skin layers.

HydraFacial: Vortex suction removes impurities while flooding skin with hydration. Deep clean meets deep nourishment.

Illustration of a woman's body highlighting features of permanent reduction and silky smooth skin, with icons indicating speed, efficiency, and comfort.

Full Body Laser: Permanent hair reduction for silky-smooth skin everywhere. No more last-minute waxing stress.

Diagram illustrating a skincare treatment process. It shows a vial labeled 'Master Antioxidant' connected to a human figure. The treatment is depicted as increasing overall skin brightness and producing an inside-out glow, with arrows indicating the flow of antioxidants into the body and the resulting brightening effect.

IV Glutathione: The body's master antioxidant delivered directly to your bloodstream. Brightens skin from the inside, affects your entire body.

korean glass facial for brightening and glow

Korean Glass Skin: The K-beauty secret to mirror-like, translucent skin. Multiple hydrating layers create incredible light reflection.

A diagram showing the process of a skincare product, with labels for exfoliate, oxygenate, infuse, and a circular icon indicating a 3-in-1 benefit.

OxyGeneo: 3-in-1 technology that exfoliates, oxygenates from within, and infuses nutrients. Your skin breathes again.

Diagram illustrating optimal skin treatment spacing and the 20-day cycle for skin regeneration, showing stages from deep stimulation to new skin layer emergence and cumulative benefits.
A bridal package menu listing three options: Blush & Glow, Ultimate Glow, and Complete Transformation, each with different facial and body treatments, prices, and icons representing the treatments.

Blush & Glow Journey

A skincare chart titled '80-Day Bridal Facial Journey' with a list of steps and corresponding skin levels. It includes visual icons, descriptions of each step from Day 0 to Day 80, and a stylized bride holding a bouquet on the right.

Ultimate Glow Journey

A golden and elegant infographic outlining a 90-day bridal skincare journey with stages from Day 0 to Day 80, involving skincare treatments like IV Glutathione and hydration, culminating in whole body transformation with glow-enhancing steps.

Complete Transformation Journey

A step-by-step skincare infographic for a complete skin refinement VIP bridal package called the Triple Transformation Journey, outlining four months of treatments with illustration icons for each step including laser, IV, face masks, and body polish, as well as individual progress charts for hair, face, and body radiance, with a silhouette of a bride in a wedding gown at the bottom.
A poster illustrating the stages of a bridal skincare transformation journey from dull, uneven skin at day 0 to radiant, glowing skin on wedding day, with age-progressed images showing improvement over 80 days.

Make Your Special Day Truly Special

Frequently Asked Questions

STILL HAVE SOME QUESTIONS ?

LET US HELP YOU OUT

Doctor od Skin and Hair in naraina village, giving reliable solutions , Book your free consultation